Idaho issues oversized load permits, but stays shipments for now

Public input is required, but conditional permits are issued-

Note: the hearing will be on Friday, Nov. 19 in Boise. The hearing will be at ITD Headquarters in Boise, 3311 W. State Street. (208) 334-8000

Advocates for the West won a brief victory Friday on behalf of local residents of Highway 12. These temporarily block the first 4 shipments (which go to Billings not Canada). They are for ConocoPhillips. Later ExxonMobil seeks to move over 200 giant shipments over the highway, which parallels the Clearwater and Lochsa Rivers, over Lolo Pass and through Montana to Alberta.

“Each of the Exxon loads would weigh 300 tons, stretch 227 feet long, reach 27 feet high and 29 feet in width – wide enough to take up both lanes of the highway. Trucks would move only at night and pull over in newly designed turnouts during the day.” Read more of this AP story by Todd Dvorak.

It has been discovered that oil companies plan to use scenic, narrow Highway 12 for at least a decade for hauling giant equipment, so this will be a continuing issue if big oil wins.